Explore our Past Projects
Our diverse portfolio of projects showcases the various subsystems of the CANDU nuclear reactor we have successfully executed upon. We are proud of work we have completed, knowing it was performed safely and to our exceptional quality, while achieving outstanding customer satisfaction.
2025


Precision
Toolshop Opening
____________________
​​​
Expanded business services to include a fully equipped space designed to create, maintain, and upgrade client tooling and equipment, as well as support mechanical design projects, R&D, and fast prototyping.
ISO Certification
____________________
​
Recognized with ISO 9001:2015 certification, a testament to our commitment to oustanding quality management and operational integrity.
2024
CNL Waste Depository
____________________
​
Generated a Design Failure Mode Risk Assessment to cover comprehensive design risks and mitigating actions for a nuclear waste storage facility
Feedwater
Emergency Repair
____________________
​​​
Facilitated the emergency tube sheet repair of the HP feedwater heater. Helped prove custom repair techniques and welding processes, overseeing the repair at Bruce Power Station


Source: Babcock Power
Source: Nucleom
Waterlancing & Inspections
____________________​_​
​
Removed hard sludge build-up from Unit 2 boilers and performed conditional assessments of main steam generation components in Cernavoda, Romania
OneH2 Hydrogen
System Registration
_____________________
​
Registered with a TTSA a Hydrogen Storage unit for OneH2 to be used at the GM Oshawa facility. This hydrogen unit is utilized to run clean, zero-emission fuel cells in fork trucks


Fuel Channel Replacement
______________________
The replacement of a single fuel channel consisting of end fittings, pressure tubes, and garter springs. Developed tooling and performed site oversight on two campaigns
Fuel Channel Shifting ​
____________________
​
Unit 3 fuel channel shifting campaign to correct elongation of 350 fuel channels due to heat and radiation at Bruce Power Generating Station

Source: BWXT

Turbine Generator
Rebuild (TGR)
____________________​
​
Completed over 150 work packages
to facilitate and plan work in DNG's Turbine Generation
Feeder Replacement
______________________
​The Unit 6 Major Component Replacement (MCR) program, completed in 2017, consisted of the replacement of all lower feeders, cantilevers, and seismic restraints


EDM (Electronic
Discharge Machining)
____________________​
​
Developed and executed acceptance testing of new tools, site procedures, documentation, and provided site execution oversight for the first-time deployment of novel repair technology in nuclear steam generators
Separator Replacement
____________________​
​
Provided multi-year project engineering support and oversight to facilitate the replacement of DNGS steam separators


Source: OneH2
Source: BWXT
Feeder Inspections
___________________________
​
​The feeder inspection program uses ultrasonic testing on feeder weld
joints to identify material thinning
and establish a scope for the next
feeder replacement campaign
Medical Isotopes
Hot Cell Building
____________________​
​
Provided construction planning and quality oversight for the construction and assembly of a new line of hot cells


Manway Manipulator Design
______________________
​
The development of a new manipulator arm design to assist in opening and closing the boiler manway cover
LRV Replacement
______________________________
​
The replacement of four Primary Heat Transport (PHT) Liquid Relief Valves (LRV) due to out-of-code conditions from heat stress and water hammer effects


Source: Bruce Power
Source: BWXT
2015