Our Experience

Explore our Past Projects

Our diverse portfolio of projects showcases the various subsystems of the CANDU nuclear reactor we have successfully executed upon. We are proud of work we have completed, knowing it was performed safely and to our exceptional quality, while achieving outstanding customer satisfaction. 

2024

Source: Nucleom

Feeder Replacement

______________________

 

The Unit 6 Major Component Replacement (MCR) program, completed in 2017, consisted of the replacement of all lower feeders, cantilevers, and seismic restraints

Turbine Generator

Rebuild (TGR)

____________________​

Completed over 150 work packages

to facilitate and plan work in DNG's Turbine Generation

FemaleWorker_Turbine_Nuclear_edited_edited_edited.jpg
recirculating-nuclear-steam-generator_edited.jpg

Source: BWXT

Picture1_edited_edited.jpg

Manway Manipulator Design

______________________

The development of a new manipulator arm design to assist in opening and closing the boiler manway cover

LRV Replacement

______________________________

The replacement of four Primary Heat Transport (PHT) Liquid Relief Valves (LRV) due to out-of-code conditions from heat stress and water hammer effects

Fuel Channel Replacement

______________________

 

The replacement of a single fuel channel consisting of end fittings, pressure tubes, and garter springs. Developed tooling and performed site oversight on two campaigns

Fuel Channel Shifting 

____________________

Unit 3 fuel channel shifting campaign to correct elongation of 350 fuel channels due to heat and radiation at Bruce Power Generating Station

EFs_edited_edited_edited_edited.jpg
Unit-2-reactor-shots-011_BW_Edit2_edited_edited.jpg
marche-nucleaire-feeders-v1-2000x1581_ed
image.png

Source: BWXT

Feeder Inspections

___________________________

The feeder inspection program uses ultrasonic testing on feeder weld

joints to identify material thinning

and establish a scope for the next

feeder replacement campaign

Medical Isotopes

Hot Cell Building

____________________

Provided construction planning and quality oversight for the construction and assembly of a new line of hot cells

Waterlancing & Inspections

_____________________​

Removed hard sludge build-up from Unit 2 boilers and performed conditional assessments of main steam generation components in Cernavoda, Romania

OneH2 Hydrogen

System Registration

_____________________

Registered with a TTSA a Hydrogen Storage unit for OneH2 to be used at the GM Oshawa facility. This hydrogen unit is utilized to run clean, zero-emission fuel cells in fork trucks

reptil-2_edited.jpg
image.png

Source: OneH2

nuclear-01.jpg

Separator Replacement

____________________

Provided multi-year project engineering support and oversight to facilitate the replacement of DNGS steam separators

EDM (Electronic

Discharge Machining)

____________________

Developed and executed acceptance testing of new tools, site procedures, documentation, and provided site execution oversight for the first-time deployment of novel repair technology in nuclear steam generators

CNL Waste Depository

____________________

Generated a Design Failure Mode Risk Assessment to cover comprehensive design risks and mitigating actions for a nuclear waste storage facility

Feedwater

Emergency Repair

____________________

Facilitated the emergency tube sheet repair of the HP feedwater heater. Helped prove custom repair techniques and welding processes, overseeing the repair at Bruce Power Station

nuclear waste.jpg
Tubes_250x250.jpg
image.png

Source: Babcock Power

RefurbMockup721x319.jpg

Source: Bruce Power

Source: BWXT

2015