Our diverse portfolio of projects showcases the various subsystems of the CANDU nuclear reactor we have successfully executed upon. We are proud of work we have completed, knowing it was performed safely and to our exceptional quality, while achieving outstanding customer satisfaction.
2024
Source: Nucleom
Feeder Replacement
______________________
The Unit 6 Major Component Replacement (MCR) program, completed in 2017, consisted of the replacement of all lower feeders, cantilevers, and seismic restraints
Turbine Generator
Rebuild (TGR)
____________________
Completed over 150 work packages
to facilitate and plan work in DNG's Turbine Generation
Source: BWXT
Manway Manipulator Design
______________________
The development of a new manipulator arm design to assist in opening and closing the boiler manway cover
LRV Replacement
______________________________
The replacement of four Primary Heat Transport (PHT) Liquid Relief Valves (LRV) due to out-of-code conditions from heat stress and water hammer effects
Fuel Channel Replacement
______________________
The replacement of a single fuel channel consisting of end fittings, pressure tubes, and garter springs. Developed tooling and performed site oversight on two campaigns
Fuel Channel Shifting
____________________
Unit 3 fuel channel shifting campaign to correct elongation of 350 fuel channels due to heat and radiation at Bruce Power Generating Station
Source: BWXT
Feeder Inspections
___________________________
The feeder inspection program uses ultrasonic testing on feeder weld
joints to identify material thinning
and establish a scope for the next
feeder replacement campaign
Medical Isotopes
Hot Cell Building
____________________
Provided construction planning and quality oversight for the construction and assembly of a new line of hot cells
Waterlancing & Inspections
_____________________
Removed hard sludge build-up from Unit 2 boilers and performed conditional assessments of main steam generation components in Cernavoda, Romania
OneH2 Hydrogen
System Registration
_____________________
Registered with a TTSA a Hydrogen Storage unit for OneH2 to be used at the GM Oshawa facility. This hydrogen unit is utilized to run clean, zero-emission fuel cells in fork trucks
Source: OneH2
Separator Replacement
____________________
Provided multi-year project engineering support and oversight to facilitate the replacement of DNGS steam separators
EDM (Electronic
Discharge Machining)
____________________
Developed and executed acceptance testing of new tools, site procedures, documentation, and provided site execution oversight for the first-time deployment of novel repair technology in nuclear steam generators
CNL Waste Depository
____________________
Generated a Design Failure Mode Risk Assessment to cover comprehensive design risks and mitigating actions for a nuclear waste storage facility
Feedwater
Emergency Repair
____________________
Facilitated the emergency tube sheet repair of the HP feedwater heater. Helped prove custom repair techniques and welding processes, overseeing the repair at Bruce Power Station